{"id":128593,"date":"2026-08-19T12:00:32","date_gmt":"2026-08-19T09:00:32","guid":{"rendered":"https:\/\/rhn.ro\/mihnea-nastases-hotel-in-poiana-brasov-moves-forward\/"},"modified":"2026-08-19T12:00:38","modified_gmt":"2026-08-19T09:00:38","slug":"mihnea-nastases-hotel-in-poiana-brasov-moves-forward","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/mihnea-nastases-hotel-in-poiana-brasov-moves-forward\/","title":{"rendered":"Mihnea N\u0103stase&#8217;s hotel in Poiana Bra\u0219ov moves forward"},"content":{"rendered":"<p>The hotel project developed by Mihnea N\u0103stase in Poiana Bra\u0219ov has passed a new administrative stage, receiving favorable approval from the Traffic Commission of Bra\u0219ov City Hall. This approval represents an essential procedural step prior to applying for and obtaining the building permit.<\/p>\n<p>In preparation since 2022, the tourist complex will be located on Drumul Sulinar. Previously, in September 2024, during the administration led by Allen Coliban, the Detailed Urban Plan (PUD) was also given the green light by the Urban Planning Commission. The planned building will operate as a hotel and features a height regime consisting of two basements, a semi-basement, ground floor, two upper floors, and an attic. The inclusion of the semi-basement represented an adjustment to the documentation to comply with the requirements of the urban planning certificate issued in December 2022. Once the traffic approval phase is completed, the project enters the stage leading up to the actual start of construction works.<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What recent approval did the Poiana Bra\u0219ov hotel project receive?<\/strong><\/p>\n<p>The project received a favorable opinion from the Traffic Commission of Bra\u0219ov City Hall.<\/p>\n<p><strong>Where will the new hotel complex be located?<\/strong><\/p>\n<p>The tourist complex developed by Mihnea N\u0103stase will be located on Drumul Sulinar in Poiana Bra\u0219ov.<\/p>\n<p><strong>What is the planned height regime for the building?<\/strong><\/p>\n<p>The hotel is designed with two basements, a semi-basement, ground floor, two upper floors, and an attic.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The hotel project developed by Mihnea N\u0103stase in Poiana Bra\u0219ov has passed a new administrative stage, receiving favorable approval from the Traffic Commission of Bra\u0219ov City Hall. This approval represents an essential procedural step prior to applying for and obtaining the building permit. In preparation since 2022, the tourist complex will be located on Drumul&hellip;<\/p>\n","protected":false},"author":0,"featured_media":92779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2853],"tags":[2908],"thb-sponsors":[],"class_list":["post-128593","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investment","tag-poiana-brasov-en"],"article_style_override":"on","post-style":"style2","post_via":[{"title":"bizbrasov.ro | 17.08","post_source_url":"https:\/\/bizbrasov.ro"}],"post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/investitii-3.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/128593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=128593"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/128593\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/92779"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=128593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=128593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=128593"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=128593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}