{"id":126467,"date":"2026-06-03T08:52:59","date_gmt":"2026-06-03T05:52:59","guid":{"rendered":"https:\/\/rhn.ro\/first-contract-signed-for-a8-eur-932-34-million\/"},"modified":"2026-06-03T08:53:15","modified_gmt":"2026-06-03T05:53:15","slug":"first-contract-signed-for-a8-eur-932-34-million","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/first-contract-signed-for-a8-eur-932-34-million\/","title":{"rendered":"First contract signed for A8: EUR 932.34 million"},"content":{"rendered":"<p>The signing of the first financing contract through the SAFE Program for the T\u00e2rgu Neam\u021b \u2013 T\u00e2rgu Frumos section of the Union Highway (A8) marks the project&#8217;s entry into the implementation phase. This strategic segment, crucial for connecting the Republic of Moldova to European transport corridors and unlocking cross-border trade, represents a major step in the development of infrastructure in eastern Romania.<\/p>\n<p>The announcement was made by the interim Prime Minister of Romania, Ilie Bolojan. The project for this lot has a length of 27 kilometers and a value of approximately EUR 932.34 million, excluding VAT. The total implementation duration is estimated at 46 months, of which 10 months are designated for design and 36 months for the execution of works. The section&#8217;s infrastructure includes the construction of 36 bridges and passages, four tunnels, and three major road junctions for regional connectivity, located at Mo\u021bca, Pa\u0219cani, and T\u00e2rgu Frumos.<\/p>\n<p>Within the same project, the connection with the Moldavia Highway (A7) will also be established through a 5.5-kilometer highway segment, designed to ensure the link between the A8, DN2, and the Pa\u0219cani road junction. The interim Prime Minister also specified that the signing of contracts for the other sections of the A8 Highway will take place in the coming period, following the resolution of appeals. The A8 Highway is considered a strategic transport corridor, aimed at supporting the economic development of the northern half of Romania, consolidating the Republic of Moldova&#8217;s position as a regional logistics hub, and playing an important role in the future reconstruction of Ukraine.<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What is the value and length of the first signed A8 contract?<\/strong><\/p>\n<p>The contract is valued at approximately EUR 932.34 million (excluding VAT) and covers a 27-kilometer section between T\u00e2rgu Neam\u021b and T\u00e2rgu Frumos.<\/p>\n<p><strong>How long will the construction of this A8 highway section take?<\/strong><\/p>\n<p>The total duration is 46 months, with 10 months allocated for design and 36 months for the execution of works.<\/p>\n<p><strong>What is the strategic importance of the A8 Highway?<\/strong><\/p>\n<p>The A8 Highway (Union Highway) connects the Republic of Moldova to European transport corridors, supports Romania&#8217;s northern economic development, and will aid in Ukraine&#8217;s reconstruction.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The signing of the first financing contract through the SAFE Program for the T\u00e2rgu Neam\u021b \u2013 T\u00e2rgu Frumos section of the Union Highway (A8) marks the project&#8217;s entry into the implementation phase. This strategic segment, crucial for connecting the Republic of Moldova to European transport corridors and unlocking cross-border trade, represents a major step in&hellip;<\/p>\n","protected":false},"author":0,"featured_media":126378,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2856],"tags":[5488],"thb-sponsors":[],"class_list":["post-126467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conectivity","tag-targu-neamt-targu-frumos"],"article_style_override":"on","post-style":"style2","post_via":[{"title":"moldpres.md | 28.05","post_source_url":"https:\/\/moldpres.md"}],"post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/transport-2.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/126467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=126467"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/126467\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/126378"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=126467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=126467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=126467"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=126467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}