{"id":125640,"date":"2026-04-29T10:18:49","date_gmt":"2026-04-29T07:18:49","guid":{"rendered":"https:\/\/rhn.ro\/itinera-to-build-the-a8-section-towards-the-republic-of-moldova\/"},"modified":"2026-04-29T10:50:26","modified_gmt":"2026-04-29T07:50:26","slug":"itinera-to-build-the-a8-section-towards-the-republic-of-moldova","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/itinera-to-build-the-a8-section-towards-the-republic-of-moldova\/","title":{"rendered":"Itinera to Build A8 Motorway Section to Moldova"},"content":{"rendered":"<p>An Italian consortium led by Itinera S.p.A. has been designated the winner of the contract for the design and execution of Section 4 of the Union Motorway (A8), a strategic investment valued at EUR 700.87 million. According to MOLDPRES, the project marks a historical premiere by constructing the first kilometers of motorway on the territory of the Republic of Moldova, ensuring the direct connection of the road infrastructure across the Prut River to the Trans-European Transport Network (TEN-T).<\/p>\n<p>The works, which will be executed by the association Itinera S.p.A. \u2013 Saipem S.p.A. \u2013 ICM S.p.A., target a total route of 19.7 kilometers, of which 15 kilometers are in Romania and 4.7 kilometers in the Republic of Moldova. The project includes 12 bridges and passages, as well as two tunnels, the longest measuring 1,700 meters. The infrastructure will provide vital connections for Ia\u0219i Airport, the Regional Hospital, and the future &#8220;Pod de Flori&#8221; (Bridge of Flowers) at Ungheni. An essential component is the development of the logistics hub at Bere\u0219ti, which will integrate road transport with European and broad-gauge rail, facilitating regional exports.<\/p>\n<p>Funding is provided through the European Commission&#8217;s Security Action for Europe (SAFE) program, intended for dual-use projects, both civil and military. The contract has a duration of 46 months, of which 10 months are dedicated to design and 36 months to the actual execution. The Secretary of State in the Ministry of Transport, Irinel Ionel Scrio\u0219teanu, emphasized that this cross-border objective will have a profound impact on the regional economy and security, being implemented on an accelerated schedule thanks to the good cooperation between Bucharest and Chi\u0219in\u0103u.<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What is the total value of the A8 Section 4 project?<\/strong><\/p>\n<p>The strategic investment for this section of the Union Motorway is valued at 700.87 million EUR.<\/p>\n<p><strong>How long will the construction of this motorway section take?<\/strong><\/p>\n<p>The contract spans 46 months, including 10 months for design and 36 months for execution.<\/p>\n<p><strong>What is the significance of this project for the Republic of Moldova?<\/strong><\/p>\n<p>It marks the construction of the first motorway kilometers in Moldova, connecting its infrastructure to the European TEN-T network.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An Italian consortium led by Itinera S.p.A. has been designated the winner of the contract for the design and execution of Section 4 of the Union Motorway (A8), a strategic investment valued at EUR 700.87 million. According to MOLDPRES, the project marks a historical premiere by constructing the first kilometers of motorway on the territory&hellip;<\/p>\n","protected":false},"author":0,"featured_media":125555,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2855],"tags":[5434],"thb-sponsors":[],"class_list":["post-125640","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rep-md","tag-itinera"],"article_style_override":"on","post-style":"style2","post_via":[{"title":"moldpres.md | 23.04","post_source_url":"https:\/\/moldpres.md"}],"post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/Republic-of-Moldova-relevant-picture.png","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/125640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=125640"}],"version-history":[{"count":1,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/125640\/revisions"}],"predecessor-version":[{"id":125644,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/125640\/revisions\/125644"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/125555"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=125640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=125640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=125640"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=125640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}