{"id":124464,"date":"2015-07-29T00:00:00","date_gmt":"2015-07-28T21:00:00","guid":{"rendered":"https:\/\/rhn.ro\/mamaia-promenade-rehabilitated-with-over-68-million-ron-investment\/"},"modified":"2026-03-28T21:54:18","modified_gmt":"2026-03-28T19:54:18","slug":"mamaia-promenade-rehabilitated-with-over-68-million-ron-investment","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/mamaia-promenade-rehabilitated-with-over-68-million-ron-investment\/","title":{"rendered":"Mamaia Promenade Rehabilitated with Over 68 Million RON Investment"},"content":{"rendered":"<div>The rehabilitation project of the tourist promenade in Mamaia resort, worth over 68 million RON and benefiting from European funding, was completed 3 years after works began, one year later than planned, as works were halted during the summer seasons.<\/div>\n<div><\/div>\n<div>The manager of the &#8220;Mamaia Tourist Promenade&#8221; project, Ani Merla, stated that this was the largest project of the Constanta City Hall with European funds in the 2007-2013 financial exercise, through the Regio program, and its completion will lead to the development of seasonal economic agents and attract more tourists.<\/div>\n<div><\/div>\n<div>The project aimed to develop and promote tourism by rehabilitating the urban public infrastructure in Mamaia resort, specifically modernizing and rearranging the tourist promenade in Constanta &#8211; Sat Vacanta area and Mamaia resort.<\/div>\n<div><\/div>\n<div>The rehabilitation works of the tourist promenade in Mamaia resort included the arrangement of sidewalks and bicycle paths, as well as a parking lot for vehicles. Additionally, a rainwater collection and discharge system was created, urban furniture, drinking fountains, and lighting poles were replaced, and road signs, information panels, and tourist orientation signs were installed.<\/div>\n<div><\/div>\n<div>The contract for the &#8220;Mamaia Tourist Promenade&#8221; project was signed in August 2012, and works began in the fall of 2013, lasting effectively 11 and a half months, with interruptions caused by weather conditions and to avoid endangering the summer season. The total value of the project was 68.6 million RON, of which 48.3 million RON was the European Union&#8217;s contribution, and 8.6 million RON each was the contribution of the Government and the beneficiary. The works were carried out by a consortium consisting of ABC Val, Mobitom, and UTI.<\/div>\n<p>Source: <a href=\"http:\/\/www.wall-street.ro\" data-wplink-url-error=\"true\">Wall-Street<\/a><\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What was the total investment for the Mamaia promenade rehabilitation?<\/strong><\/p>\n<p>The total value of the project was 68.6 million RON, with significant funding provided by the European Union.<\/p>\n<p><strong>Why did the project take three years to complete?<\/strong><\/p>\n<p>Although actual work took about 11.5 months, the project spanned three years due to pauses during the summer seasons and weather-related delays.<\/p>\n<p><strong>What specific infrastructure improvements were included?<\/strong><\/p>\n<p>The project included new sidewalks, bicycle paths, a parking lot, modern lighting, urban furniture, and a new rainwater drainage system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The rehabilitation project of the tourist promenade in Mamaia resort, worth over 68 million RON and benefiting from European funding, was completed 3 years after works began, one year later than planned, as works were halted during the summer seasons. The manager of the &#8220;Mamaia Tourist Promenade&#8221; project, Ani Merla, stated that this was the&hellip;<\/p>\n","protected":false},"author":0,"featured_media":65509,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2853],"tags":[],"thb-sponsors":[],"class_list":["post-124464","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investment"],"article_style_override":"","post-style":"","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/investitii-3.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/124464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=124464"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/124464\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/65509"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=124464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=124464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=124464"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=124464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}