{"id":120746,"date":"2018-07-21T00:00:00","date_gmt":"2018-07-20T21:00:00","guid":{"rendered":"https:\/\/rhn.ro\/16-million-ron-project-for-rasnov-fortress-rehabilitation\/"},"modified":"2026-03-28T09:52:14","modified_gmt":"2026-03-28T07:52:14","slug":"16-million-ron-project-for-rasnov-fortress-rehabilitation","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/16-million-ron-project-for-rasnov-fortress-rehabilitation\/","title":{"rendered":"16 million RON Project for Rasnov Fortress Rehabilitation"},"content":{"rendered":"<div>The tender for the design and rehabilitation of Rasnov Fortress has been completed, announced the local mayor Liviu Butnariu. The project, worth 16 million RON, will be executed over 2 years.&nbsp;<\/div>\n<div><\/div>\n<div>Butnariu stated that the tender was finalized on July 19, and currently, the results are being analyzed by the National Agency for Public Procurement, ANAP.<\/div>\n<div><\/div>\n<div>After this stage concludes, the companies that submitted bids will be notified of the result, and if there are no appeals, the contract will be signed within 5 days.<\/div>\n<div><\/div>\n<div>\u201cThe project involves consolidating the buildings within the fortress, the images on them, exhibition spaces will be created, and their electricity supply will be ensured,\u201d the mayor stated.<\/div>\n<p>Source: <a href=\"http:\/\/www.profit.ro\" data-wplink-url-error=\"true\">Profit<\/a><\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What is the value of the Rasnov Fortress rehabilitation project?<\/strong><\/p>\n<p>The project has a total value of 16 million RON.<\/p>\n<p><strong>How long will the restoration works take?<\/strong><\/p>\n<p>The execution of the design and rehabilitation works is estimated to take 2 years.<\/p>\n<p><strong>What type of works will be performed at the fortress?<\/strong><\/p>\n<p>The project includes building consolidation, the creation of exhibition spaces, and ensuring the electricity supply.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The tender for the design and rehabilitation of Rasnov Fortress has been completed, announced the local mayor Liviu Butnariu. The project, worth 16 million RON, will be executed over 2 years.&nbsp; Butnariu stated that the tender was finalized on July 19, and currently, the results are being analyzed by the National Agency for Public Procurement,&hellip;<\/p>\n","protected":false},"author":0,"featured_media":67346,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2853],"tags":[],"thb-sponsors":[],"class_list":["post-120746","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investment"],"article_style_override":"","post-style":"","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/investitii-3.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/120746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=120746"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/120746\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/67346"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=120746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=120746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=120746"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=120746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}