{"id":120238,"date":"2019-03-07T00:00:00","date_gmt":"2019-03-06T22:00:00","guid":{"rendered":"https:\/\/rhn.ro\/e20m-investment-to-expand-constanta-dolphinarium\/"},"modified":"2026-03-27T20:13:41","modified_gmt":"2026-03-27T18:13:41","slug":"e20m-investment-to-expand-constanta-dolphinarium","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/e20m-investment-to-expand-constanta-dolphinarium\/","title":{"rendered":"\u20ac20M Investment to Expand Constanta Dolphinarium"},"content":{"rendered":"<div>The Constanta Dolphinarium will be expanded and, in parallel, a new aquarium will be built to replace the old one, with investments in the two projects estimated at nearly \u20ac20 million, stated Horia Tutuianu, President of the Constanta County Council.<\/div>\n<div><\/div>\n<div>The two projects will be carried out with funds from the Ministry of Tourism and European funds and are expected to be completed within a maximum of 2 years.<\/div>\n<div><\/div>\n<div>Three years ago, a new dolphinarium was inaugurated in Constanta following an investment of approximately \u20ac7 million, with the old one being decommissioned. Now, the Constanta County Council has submitted documentation to the Ministry of Tourism to obtain funds intended for the expansion of the new dolphinarium.<\/div>\n<p>Source: <a href=\"http:\/\/www.profit.ro\" data-wplink-url-error=\"true\">Profit<\/a><\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What is the total value of the investment in Constanta?<\/strong><\/p>\n<p>The total investment for expanding the dolphinarium and building a new aquarium is estimated at approximately \u20ac20 million.<\/p>\n<p><strong>How will these projects be funded?<\/strong><\/p>\n<p>The projects will be financed through the Ministry of Tourism and European funds.<\/p>\n<p><strong>What is the estimated completion timeline?<\/strong><\/p>\n<p>Both the expansion of the dolphinarium and the construction of the new aquarium are expected to be completed within a maximum of 2 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Constanta Dolphinarium will be expanded and, in parallel, a new aquarium will be built to replace the old one, with investments in the two projects estimated at nearly \u20ac20 million, stated Horia Tutuianu, President of the Constanta County Council. The two projects will be carried out with funds from the Ministry of Tourism and&hellip;<\/p>\n","protected":false},"author":0,"featured_media":67602,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2853],"tags":[],"thb-sponsors":[],"class_list":["post-120238","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investment"],"article_style_override":"","post-style":"","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/investitii-3.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/120238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=120238"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/120238\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/67602"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=120238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=120238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=120238"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=120238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}