{"id":116699,"date":"2022-07-18T01:14:43","date_gmt":"2022-07-17T22:14:43","guid":{"rendered":"https:\/\/rhn.ro\/new-hotel-to-be-developed-in-oradea\/"},"modified":"2026-03-06T23:37:07","modified_gmt":"2026-03-06T21:37:07","slug":"new-hotel-to-be-developed-in-oradea","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/new-hotel-to-be-developed-in-oradea\/","title":{"rendered":"New Hotel to be Developed in Oradea"},"content":{"rendered":"<p>In an existing building with a basement, ground floor, first floor, and attic located in the center of Oradea, a hotel with 14 apartments and adjacent common spaces will be developed. A new building will be added to the existing structure in the courtyard.<\/p>\n<p>The project includes the renovation, interior and exterior modifications, extension with a building wing, demolition of the existing ground-floor structure and construction of a new wing, and fencing of the land.<\/p>\n<p>In the building, there will be two apartments on the ground floor, 5 apartments on the first floor, and 7 apartments in the attic. The land has a total area of 813 sqm, of which nearly 450 sqm are occupied by buildings.<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>Where will the new hotel be located?<\/strong><\/p>\n<p>The new hotel will be developed within an existing building situated in the city center of Oradea.<\/p>\n<p><strong>How many accommodation units will the project offer?<\/strong><\/p>\n<p>The hotel will feature a total of 14 apartments, distributed across the ground floor, first floor, and attic.<\/p>\n<p><strong>What additional works are planned for the project?<\/strong><\/p>\n<p>The project involves interior and exterior modifications, the construction of a new building wing in the courtyard, and the fencing of the property.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In an existing building with a basement, ground floor, first floor, and attic located in the center of Oradea, a hotel with 14 apartments and adjacent common spaces will be developed. A new building will be added to the existing structure in the courtyard. The project includes the renovation, interior and exterior modifications, extension with&hellip;<\/p>\n","protected":false},"author":0,"featured_media":70361,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2853],"tags":[2861,2937],"thb-sponsors":[],"class_list":["post-116699","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investment","tag-hotel-en","tag-oradea-en"],"article_style_override":"on","post-style":"style2","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/investitii-3.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/116699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=116699"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/116699\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/70361"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=116699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=116699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=116699"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=116699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}