{"id":115955,"date":"2023-07-27T15:43:08","date_gmt":"2023-07-27T12:43:08","guid":{"rendered":"https:\/\/rhn.ro\/update-hampton-by-hilton-hotel-inaugurated-in-targu-mures\/"},"modified":"2026-03-06T12:28:18","modified_gmt":"2026-03-06T10:28:18","slug":"update-hampton-by-hilton-hotel-inaugurated-in-targu-mures","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/update-hampton-by-hilton-hotel-inaugurated-in-targu-mures\/","title":{"rendered":"Update: Hampton by Hilton Hotel Inaugurated in T\u00e2rgu Mure\u015f"},"content":{"rendered":"<p>In July of this year 2023, the inauguration of the Hampton by Hilton hotel took place in T\u00e2rgu Mure\u015f, an 11 million EUR investment by Multinvest Group, co-financed at a rate of 35% by the Pro Economica Foundation.<\/p>\n<p>The construction of the 6-story building with a usable area of 5000 sqm began in April 2021 and lasted two years. Hampton by Hilton T\u00e2rgu Mure\u015f has a total capacity of 115 rooms and has been classified as a 4-star hotel.<\/p>\n<p>The rooms have different capacities and various amenities, from standard single rooms to connecting family rooms, thus addressing several types of tourists: business, leisure, groups, families.<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>Who are the main investors for Hampton by Hilton T\u00e2rgu Mure\u015f?<\/strong><\/p>\n<p>The hotel is an 11 million EUR project by Multinvest Group, with 35% of the funding provided by the Pro Economica Foundation.<\/p>\n<p><strong>What are the technical specifications of the hotel?<\/strong><\/p>\n<p>The hotel is a 4-star facility featuring 6 floors, a usable area of 5000 sqm, and a total capacity of 115 guest rooms.<\/p>\n<p><strong>When did the construction start and when was the hotel opened?<\/strong><\/p>\n<p>Construction began in April 2021 and lasted two years, with the official inauguration occurring in July 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In July of this year 2023, the inauguration of the Hampton by Hilton hotel took place in T\u00e2rgu Mure\u015f, an 11 million EUR investment by Multinvest Group, co-financed at a rate of 35% by the Pro Economica Foundation. The construction of the 6-story building with a usable area of 5000 sqm began in April 2021&hellip;<\/p>\n","protected":false},"author":0,"featured_media":91784,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2852],"tags":[1748,3426,846],"thb-sponsors":[],"class_list":["post-115955","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hotels-restaurants","tag-hampton","tag-hilton-en","tag-targu-mures"],"article_style_override":"on","post-style":"style2","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/hotelieri-2.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/115955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=115955"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/115955\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/91784"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=115955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=115955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=115955"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=115955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}