{"id":114861,"date":"2024-04-04T07:18:05","date_gmt":"2024-04-04T04:18:05","guid":{"rendered":"https:\/\/rhn.ro\/timisoara-international-airport-completes-construction-of-new-schengen-terminal\/"},"modified":"2026-02-22T22:34:58","modified_gmt":"2026-02-22T20:34:58","slug":"timisoara-international-airport-completes-construction-of-new-schengen-terminal","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/timisoara-international-airport-completes-construction-of-new-schengen-terminal\/","title":{"rendered":"Timi\u015foara International Airport Completes Construction of New Schengen Terminal"},"content":{"rendered":"<p>Traian Vuia International Airport in Timi\u015foara has completed the construction of the new Schengen terminal, with the total value of the contract signed with the construction company Concelex, the General Contractor of the works, amounting to 115 million RON excluding VAT.<\/p>\n<p>The works were carried out by a consortium of companies\u2014Concelex Engineering, Concrete &amp; Design Solutions, and Metroul SA\u2014with Concelex, one of the most prominent Romanian integrated construction companies, serving as the General Contractor.<\/p>\n<p>The terminal inaugurated on Friday, March 29, has a built area of 12,000 sqm and features 6 passenger security filters, 18 check-in counters, and eight boarding gates, designed to serve a traffic of 1,554 passengers simultaneously across two flows, namely external departures and external arrivals.<\/p>\n<p>&nbsp;<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>What is the processing capacity of the new terminal?<\/strong><\/p>\n<p>The terminal is designed to handle 1,554 passengers simultaneously across both departure and arrival flows.<\/p>\n<p><strong>Who was the general contractor for this project?<\/strong><\/p>\n<p>The construction was led by Concelex, a major Romanian integrated construction firm, as part of a specialized consortium.<\/p>\n<p><strong>What are the main facilities included in the new building?<\/strong><\/p>\n<p>The 12,000 sqm facility includes 6 security filters, 18 check-in counters, and 8 boarding gates.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Traian Vuia International Airport in Timi\u015foara has completed the construction of the new Schengen terminal, with the total value of the contract signed with the construction company Concelex, the General Contractor of the works, amounting to 115 million RON excluding VAT. The works were carried out by a consortium of companies\u2014Concelex Engineering, Concrete &amp; Design&hellip;<\/p>\n","protected":false},"author":0,"featured_media":89607,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2856],"tags":[1993,2930],"thb-sponsors":[],"class_list":["post-114861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conectivity","tag-aeroport-international","tag-timisoara-en"],"article_style_override":"on","post-style":"style2","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/transport-2.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/114861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=114861"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/114861\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/89607"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=114861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=114861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=114861"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=114861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}