{"id":114773,"date":"2024-05-23T08:32:45","date_gmt":"2024-05-23T05:32:45","guid":{"rendered":"https:\/\/rhn.ro\/bucharest-south-airport-the-new-gateway-to-europe\/"},"modified":"2026-02-22T22:17:13","modified_gmt":"2026-02-22T20:17:13","slug":"bucharest-south-airport-the-new-gateway-to-europe","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/bucharest-south-airport-the-new-gateway-to-europe\/","title":{"rendered":"Bucharest-South Airport: The New Gateway to Europe"},"content":{"rendered":"<p>Two areas in Giurgiu &#8211; Gr\u0103di\u0219tea and Aduna\u021bi Cop\u0103ceni &#8211; are being considered for the construction of the &#8220;Bucharest South&#8221; Airport, declared the Mayor of Sector 4, Daniel B\u0103lu\u021b\u0103. The location will be determined by the feasibility study, which is expected to be ready by the end of the year. The proposal is for the airport to be built on an area of up to 700 ha, to handle 11.5 million passengers\/year, and the estimated cost of the investment, which includes expropriations, is over EUR 2 billion.<\/p>\n<p>The proposal is for the airport to be built on an area between 300 and 700 hectares in the first phase, for a maximum of 11.5 million passengers\/year, and in the second stage, with the possibility of expansion up to 1,300 ha \/ 20 million passengers\/year.<\/p>\n<p>The proposed runway length is 3,450 m, with the development of a 3,000 sqm cargo terminal \/ 30,172 tons\/year and 4,341 parking spaces. The investment value amounts to EUR 2 billion excluding VAT, of which the value of expropriations is EUR 10 million.<\/p>\n<p>Mayor Daniel B\u0103lu\u021b\u0103 says the local authority will handle the expropriations, feasibility studies, and a business plan, then seek financing solutions and partnerships, including public-private partnerships currently under discussion.<\/p>\n<p>\u201cThere are two areas in Giurgiu County that we are considering &#8211; Gr\u0103di\u0219tea and Aduna\u021bi Cop\u0103ceni. These are the two analyzed areas. The location will be established based on what the pre-feasibility\/feasibility study reveals to us. This location is not chosen subjectively. It is a consequence of these studies being conducted right now, and an extremely important factor is related to the area we will have to expropriate, because this is the fundamental role of the association with the Giurgiu County Council. We could have an area from 300-400 hectares up to 1,000 hectares. Even urban planning elements must be modified so that, in the long term, even if we do not expropriate all the land necessary for development, that land remains undeveloped,\u201d declared Mayor Daniel B\u0103lu\u021b\u0103.<\/p>\n<p><strong>A feasibility study for &#8220;Bucharest South&#8221; Airport could be ready by September 2025<\/strong><\/p>\n<p>According to estimates by specialists hired by the Sector 4 City Hall, the pre-feasibility study should be completed in August 2024, and one year later, in September 2025, both the feasibility study and the Zonal Urban Plan (PUZ) should be available. The start of design and execution procedures is estimated for October 2025, with the project expected to be completed within a maximum of three years from the issuance of the work commencement order.<\/p>\n<h3>Frequently Asked Questions<\/h3>\n<p><strong>Where will the Bucharest-South Airport be located?<\/strong><\/p>\n<p>The airport is planned for Giurgiu County, specifically targeting the Gr\u0103di\u0219tea and Aduna\u021bi Cop\u0103ceni areas, with the final site to be determined by ongoing feasibility studies.<\/p>\n<p><strong>What is the estimated capacity and cost of the project?<\/strong><\/p>\n<p>The project represents a \u20ac2 billion investment, initially designed for 11.5 million passengers per year with the potential to expand to 20 million passengers across 1,300 hectares.<\/p>\n<p><strong>When will the new airport be operational?<\/strong><\/p>\n<p>Construction is estimated to begin in October 2025, with a completion timeline of approximately three years following the start of works.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two areas in Giurgiu &#8211; Gr\u0103di\u0219tea and Aduna\u021bi Cop\u0103ceni &#8211; are being considered for the construction of the &#8220;Bucharest South&#8221; Airport, declared the Mayor of Sector 4, Daniel B\u0103lu\u021b\u0103. The location will be determined by the feasibility study, which is expected to be ready by the end of the year. The proposal is for the&hellip;<\/p>\n","protected":false},"author":0,"featured_media":93359,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2856],"tags":[],"thb-sponsors":[],"class_list":["post-114773","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conectivity"],"article_style_override":"on","post-style":"style2","post_via":"","post-top-image":"https:\/\/rhn.ro\/wp-content\/uploads\/2019\/11\/transport-2.jpg","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/114773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=114773"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/114773\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/93359"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=114773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=114773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=114773"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=114773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}