{"id":108020,"date":"2024-10-30T09:54:58","date_gmt":"2024-10-30T07:54:58","guid":{"rendered":"https:\/\/rhn.ro\/chisinau-international-airport-has-started-repairing-aircraft-parking-lots\/"},"modified":"2024-10-30T09:54:58","modified_gmt":"2024-10-30T07:54:58","slug":"chisinau-international-airport-has-started-repairing-aircraft-parking-lots","status":"publish","type":"post","link":"https:\/\/rhn.ro\/en\/chisinau-international-airport-has-started-repairing-aircraft-parking-lots\/","title":{"rendered":"Chisinau International Airport has started repairing aircraft parking lots"},"content":{"rendered":"<p style=\"text-align: justify; background: white; margin: 0cm 0cm 18.0pt 0cm;\"><span style=\"font-size: 11.0pt; font-family: 'Arial','sans-serif'; color: black;\">Chisinau International Airport has started repair works on aircraft parking lots on the passenger boarding-deplaning platform.<\/span><\/p>\n<p style=\"text-align: justify; background: white; margin: 0cm 0cm 18.0pt 0cm;\"><span style=\"font-size: 11.0pt; font-family: 'Arial','sans-serif'; color: black;\">According to the airport administration, repair works have started on the parking lots as well as on the taxiways on the old passenger boarding-deplaning platform.<\/span><\/p>\n<p style=\"text-align: justify; background: white; margin: 0cm 0cm 18.0pt 0cm;\"><span style=\"font-size: 11.0pt; font-family: 'Arial','sans-serif'; color: black;\">The interventions will be carried out in four stages over one month. They include repairs to parking lots Nos. 1, 3, 5, 16, 17, 18, 20, 22, 24, as well as the taxiways. The workers will carry out milling and removal of damaged asphalt, apply a new layer of asphalt material, renovate all road markings as well as those for aircraft and apply an asphalt surface protection material.  <\/span><\/p>\n<p style=\"text-align: justify; background: white; margin: 0cm 0cm 18.0pt 0cm;\"><span style=\"font-size: 11.0pt; font-family: 'Arial','sans-serif'; color: black;\">The work is necessary to ensure flight safety, but also to extend the operational life and protect the surfaces from precipitation.  <\/span><span style=\"font-size: 11.0pt; font-family: 'Arial','sans-serif'; color: black;\">During the summer of this year, routine maintenance work was carried out on the main runway 08\/26 of the air terminal.<\/span><\/p>\n<p style=\"text-align: justify; background: white; margin: 0cm 0cm 18.0pt 0cm;\"><span style=\"font-size: 11.0pt; font-family: 'Arial','sans-serif'; color: black;\">Chisinau International Airport returned to state management last spring.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Chisinau International Airport has started repair works on aircraft parking lots on the passenger boarding-deplaning platform. According to the airport administration, repair works have started on the parking lots as well as on the taxiways on the old passenger boarding-deplaning platform. The interventions will be carried out in four stages over one month. They include&hellip;<\/p>\n","protected":false},"author":8,"featured_media":107726,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2855],"tags":[3284,3282],"thb-sponsors":[],"class_list":["post-108020","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rep-md","tag-aircraft","tag-chisinau-international-airport"],"article_style_override":"","post-style":"","post_via":"","post-top-image":"","_links":{"self":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/108020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/comments?post=108020"}],"version-history":[{"count":0,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/posts\/108020\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media\/107726"}],"wp:attachment":[{"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/media?parent=108020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/categories?post=108020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/tags?post=108020"},{"taxonomy":"thb-sponsors","embeddable":true,"href":"https:\/\/rhn.ro\/en\/wp-json\/wp\/v2\/thb-sponsors?post=108020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}