PUD approved for aparthotel on Calea Dorobanților

The Urban Planning Commission has approved a Detailed Urban Plan (PUD) for 65 Calea Dorobanților, a project initiated by SC Hexagon Town S.R.L. that involves developing a mixed-use complex comprising an aparthotel and ground-floor commercial spaces. The approval was granted on the condition of increasing the setback from the neighboring property on the eastern boundary of the plot from 3.7 to 4.5 meters.

Designed by SC Arhivers S.R.L., the project is situated on a 1,215 sq m plot and involves demolishing existing structures to allow the construction of two building wings: Wing A facing the street, with a height regime of B+GF+5F+R, and Wing B, structured as B+GF+1F+2A. Pedestrian and vehicle access will be maintained from Dorobanților Street, and entry to the underground parking garage—sized in accordance with the Cluj-Napoca General Urban Plan (PUG) regulations to serve both buildings—will be facilitated through a passageway connecting to the interior ramp. Upon completion, landscaped green areas for future occupants will cover 36.23% of the land area.

Frequently Asked Questions

What is being built on Calea Dorobanților 65?

The project consists of a mixed-use complex featuring an aparthotel, ground-floor commercial premises, and underground parking across two buildings.

Who is developing this project?

The project was initiated by SC Hexagon Town S.R.L. and designed by architecture firm SC Arhivers S.R.L.

What condition was imposed for the PUD approval?

The Urban Planning Commission approved the plan on the condition of increasing the eastern property boundary setback from 3.7 to 4.5 meters.