Hotel projects worth over €2B underway in Romania

The Romanian hotel market has 376 accommodation projects underway in 2026, valued at approximately €2.03 billion, amid the expansion of international brands and rising revenues in the capital city. Although investment volume is mainly driven by new builds concentrated in Constanța and Brașov counties, the national occupancy rate during the first eight months of 2026 dropped to 29.3%, highlighting the persistent gap between supply growth and marginal gains in tourism demand.

The national investment pipeline comprises 307 new builds, 33 renovations, 29 expansions, and seven modernizations, according to data from the Victa platform (IBC Focus). In the regional rankings, Constanța leads by a wide margin with 67 construction sites, followed by Brașov with 24 projects, Gorj and Vâlcea with 20 each, Bucharest with 17, and Alba with 15. Bihor, Cluj, and Caraș-Severin each host 13 projects, while Mehedinți and Ialomița have two each, and Teleorman, Botoșani, Vaslui, and Brăila report a single site each. For the 2026–2029 period, 39 hotel projects totaling over 5,300 rooms have been announced, adding 50% to the capacity affiliated with international chains, according to data from TrendsHRB and Horwath HTL Romania published by Construct-Intelligence. Brands aiming to enter the market include The Hoxton, Hyatt Regency, Kempinski, Hotel Indigo, Mondrian, and Radisson RED. In parallel, already established networks are increasing their presence: Mercure (Accor) announced eight new hotels in Bucharest, Brașov, Craiova, Oradea, and Bacău, while Radisson is developing six properties in Bucharest, Timișoara, Brașov, and Constanța.

In Bucharest, hotel revenues rose by 5% in the first half of 2026 compared to the same period in 2025 and by 25.2% compared to pre-pandemic levels, according to a Cushman & Wakefield study reviewed by Economedia. This trend supports projects totaling over 1,500 rooms scheduled through 2028, including Swissotel, Hyatt House & Hyatt Place Nusco City, Ambasador Hotel The Julius, and the property at Promenada Mall, while 2026 saw planned openings for Hilton Garden Inn Militari and Tecadra Bucharest Handwritten Collection (225 rooms combined). On the operational side, tourist flow between January 1 and August 31, 2026, totaled 9.756 million arrivals (+0.7% compared to the first eight months of 2025) and 21.184 million overnight stays (+0.1%), with flows dominated by Romanian tourists at over 80%, averaging stays of 2.1 to 2.2 days. The highest volumes were absorbed by Constanța (1.862 million arrivals; 5.758 million overnight stays), Bucharest (1.268 million arrivals; 2.597 million overnight stays), and Brașov (878,300 arrivals; 1.687 million overnight stays), although the overall occupancy rate declined by 1.6 percentage points compared to the first eight months of 2025.

Frequently Asked Questions

What is the total value of hotel projects underway in Romania in 2026?

The Romanian hotel market has 376 accommodation projects underway, valued at approximately €2.03 billion, predominantly comprising new construction.

Which regions lead in hotel development across Romania?

Constanța leads comfortably with 67 construction sites, followed by Brașov with 24 projects, Gorj and Vâlcea with 20 each, and Bucharest with 17.

How has national hotel occupancy performed amid this expansion?

In the first eight months of 2026, national hotel occupancy dropped to 29.3%, down by 1.6 percentage points, reflecting a persistent gap between supply growth and modest demand increases.